Stump Pond Dam Removal

Rindge, New Hampshire

D&K designed the temporary breach of a failed spillway on an 800-foot-long earthen dam. D&K’s water resources staff completed the breach design and provided permitting assistance. D&K assisted the owner in choosing repair/reconstruction alternatives to restore the water body to its originally designed condition. The owner elected to pursue a permanent breach of the dam.

  • Stump Pond Dam Removal
  • Stump Pond Dam Removal Stump Pond Dam Removal
  • Stump Pond Dam Removal Stump Pond Dam Removal
  • Stump Pond Dam Removal Stump Pond Dam Removal
  • Stump Pond Dam Removal Stump Pond Dam Removal

Related Projects