Winooski, Vermont
For Green Mountain Power’s Winooski Gorge 18 hydroelectric facility, DuBois & King provided structural and dam engineering services for a series of structural deficiencies and safety and accessibility improvements. Located on the Winooski River, the facility consists of a gate structure, forebay, concrete intake structure, concrete penstock, 14-ft diameter riveted steel penstock, riveted steel spiral case, Kaplan turbine, generator unit, and tailrace structure. Projects included:
New generator catwalk
New access ladder and platform for inflatable bladder maintenance
Rock face stability review
Horizontal lifeline rating project
Construction flashboard design for inflatable bladder project
Utility bridge decking alternatives
Powerhouse crack investigation
Design of fall protection and ladders for access across dam crest