Brookline, New Hampshire
Transportation Enhancement grant sidewalk project to design and construct new sections of sidewalk on Route 130, totaling 4,800 lf. The sections of sidewalk connect the Town’s safety complex with an existing sidewalk on the north side of the Town’s center at Austin Road and link South Main Street with the intersection of Main and Elm Streets. Services include survey, design, permitting, public outreach, ROW, utility coordination, bid phase assistance, and construction administration and observation. Permitting includes CE documentation and Section 106 cultural resources. The project was randomly selected by FHWA for Federal audit and found to be in full compliance. This project followed the NHDOT Local Public Agency (LPA) process.