Cochecho Pump Station Upgrades

Dover, New Hampshire | City of Dover

The city completed the design of improvements to the existing wastewater pump station. Through that process, it became evident that the existing system had reached the end of its operating life, and selected components should be replaced rather than upgraded to provide increased reliability, energy efficiency, safety, and compatibility with other city pump stations. D&K led the reconstruction of the pump station, including the pump, controls, appurtenant site improvements, standby generator, and evaluation/mitigation of hazardous materials, including petroleum present at the site. 

Markets:

Project Elements

• 40,000-60,000 GPD pump station
• Provided in-house survey, civil and electrical design and construction phase services
• Performed existing conditions survey of the sewer pump station, including tying into the boundary lines, measuring the inverts in the pump station, and confirming it was outside the flood zone