Selected for two simultaneous Industrial Park Improvements for water and sewer line replacements and infrastructure improvements at the CEDA Industrial Park. One project included replacement of 1,400 ft of waterline with 8 inch HDPE. The other project involved design of a new 1,000 ft access road including related water, sanitary and sewer, and power/communications systems.
Services included topographic survey, layout of the proposed water line, preparation of final roadway and utility design construction documents, sedimentation and erosion control plan, construction specifications, permitting, and bid and construction phase services. Design was delivered within a short time frame (30 days) to meet owner objectives for late fall construction start and completion of the water and sewer line replacements before winter shut down. This was a 100% CDBG funded project. Successful delivery of the design on time and bid documents with strategic bid alternatives allowed the owner to construct all aspects of the project.