Wetland Mitigation, EIS, Bennington Bypass

Bennington, Vermont | Vermont Agency of Transportation

VTrans prepared a Draft Environmental Impact Statement (DEIS) for the Bennington Bypass project and needed assistance creating a Final EIS. Following the completion of the FEIS by D&K, VTrans engaged D&K to design a wetland mitigation site and to assist in the documentation and preparation of permit applications associated with the construction of approximately 10 miles of limited-access highway along a new alignment. 

Markets:

Project Elements

• Field-identified potential environmental impacts of alternative alignments
• Developed a Final Environmental Impact Statement for a new 10-mile-long highway
• Designed a 25.3-acre wetland mitigation project
• Assisted with USACE 404, 401 Water Quality Certification, Stream Alteration (Title 19), Rare or Endangered Species Permitting, NPDES Construction Stormwater, Wildlife Passage/Habitat, and Stormwater Discharge permits.